5S BERM

A. Introduction

An economical local technology that provides advanced, environmentally friendly solutions, alternative to traditional solutions in crude oil, marl and sand dune removal applications, including Such us:

  •  Sand movement control of highways and railways to keep it safe 
  • Sand & soil Erosion control of pipelines capping
  • Facility protection

C. Maintenance

  • Crust maintenance:
  • Crust should be inspected after 24 months from application. Damaged area should be sprayed.

 

  • Sand removing maintenance:
  1. Sand accumulated on the front and the back of the berm should be removed.
  2. Sand level on the berm sides should be inspected every (24) months. When required sand should be removed.

D. Benefits

  • 5S provides a SIMPLE – EASY – COST EFFECTIVE Solutions for the treatment of the sides and embankments of roads that run through sandy areas & erosion controal of pipleine caping
  • this will prohibit sand blowing and collecting on the roads
  • will greatly improve visibility and road safety.
  • This initial Application will last 5 + years.
  • Easy to Apply, Environmentally safe, and will leave the sand in its natural colour . 

2.Cost saving

  • Sand removing maintenance will be MUCH
  • Sand removal can be scheduled
  • Maintenance will be scheduled
  • Saving 20-40%